BlogguideModern Operating Systems

August 8, 2021by Dataman0

Hits: 0

Modern Operating Systems Subject – Modern Operating Systems

Q1. List at least four (4) standard industry benchmarks of CPU’s; define and explain each.

Note: 150 words with intext citations and References must.

Q2. Read the below paragraph and write your opinion.

Note: 150 words with intext citation and references must.

Modern Operating Systems WiMAX standard has some barriers, such as one must have a separate set of cables that go across each side of the firewall. This technology works on twisted pair wiring. The line inside the firewall acts as a hub or bridge between the computer and the network (Khalifa et al., 2021). Once the device arrives on the local network, it can be routed back to the central computer for further processing. The application software then generates random bits called random bytes, which can be processed in this manner. The output from a chip’s CPU is also unexpected and will be developed during the realization of a cipher text. More than 8,000 wireless access points in more than 100 countries with coverage extend to every home in the country. Higher revenue from WiMAX customers. More than 15 million home WiMAX Customers Wireless networks have become more sophisticated and reliable over the years. However, the technology continues to grow with new features and improvements (Kulkarni & Srinivasan, 2021). Modern Operating Systems

Modern Operating Systems

 

Subject – Internship

Q3. Read the below paragraph and write your opinion.

Note: 150 words with intext citation and references must.

 

In my company, we implement waterfall method to the majority of applications and projects. The main idea of the waterfall method during the AD&S are to plan and then implement. Our customers tell us what requirement they have and the specific timeline they need the product. Then we start the projects using the waterfall method which includes continuous planning and progress within a defined time period. The entire project starts with the negotiation with stakeholders, including recording, analysis, verification and final approval of a complete set of business requirements. After collecting specific requirements, the team will enter the next phase of project design and detailed planning, implementation and testing.

 

Q4. Read the below paragraph and write your opinion.

Note: 150 words with intext citation and references must.

The waterfall methodology my company is using needs detailed management plan, which includes 5 steps: project design, implementation, testing, deployment and maintenance. Each phase needs documentation to support the success of implementing AD&S. There are three documentations which are very critical to the whole process.

Risk assessment: it is important to have risk assessment to provide help to organization like decreasing operational risks by identifying and analyzing the risk and then evaluating the risk. Besides, this document will assist in helping safety performance get better and achieving each team’s objects.

Work Breakdown Structure (WBS): It is an important PM document, which this is used to help manager break work into smaller tasks and make each work approachable.

Quality Management Plan: It is a plan to let everyone understand the quality standard and the importance of the product quality. Project managers will oversee the whole project quality and will assign different team members to help with inspection or check each other’s work.

 

 

 

 

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *