BlogguideComputer Support for Project Management

August 10, 2021by Dataman0

Hits: 0

ISCUSSION

Assigned Readings:

Chapter 14. Computer Support for Project Management

Chapter 15. Project Termination

Initial Postings: Computer Support for Project Management Read and reflect on the assigned readings for the week. Then post what you thought was the most important concept(s), method(s), term(s), and/or any other thing that you felt was worthy of your understanding in each assigned textbook chapter.Your initial post should be based upon the assigned reading for the week, so the textbook should be a source listed in your reference section and cited within the body of the text. Other sources are not required but feel free to use them if they aid in your discussion.

Also, provide a graduate-level response to each of the following questions:

  1. Several years ago, the U.S. Congress canceled funding for the development of a battery-powered electric vehicle. Do you think that was a good decision? Can you imagine what the pros and cons were?
  2. Assume that you are working for a computer manufacturer as a software engineer and that you are told abruptly that your project will be canceled within 4 weeks. List the questions that you would have for management. After absorbing the shock, what would you do?

[Your post must be substantive and demonstrate insight gained from the course material. Postings must be in the student’s own words – do not provide quotes!]

APA format (including Times New Roman with font size 12 and double spaced). Post the actual body of your paper in the discussion thread then attach a Word version of the paper for APA review]

Response to Other Student Postings:  Respond substantively to the post of at least two peers

Content Knowledge & Structure, Critical Thinking, Clarity & Effective Communication, Integration of Knowledge & Articles, Presentation, Writing Mechanics, and Response to Other Students.

 

Computer Support for Project Management

 

PROBLEM SET

Activity I: As part of your company’s effort to select a project management software package, you have been asked to approach several other companies that presently use such packages.

  1. Develop a questionnaire to help collect the relevant information.
  2. Fill out two questionnaires, each representing a different software package.
  3. Compare the responses of the companies and select the best software of the two.

Activity II: Identify two projects in which you have been involved recently.

  1. Describe each project briefly.
  2. Suggest criteria that may have been used to identify the start of the termination phase of each project.
  3. Give two examples of activities that were performed poorly during the termination phase of either project, and suggest measures that might have been taken to improve the situation.

The assignment is to answer the question provided above in essay form. This is to be in narrative form and should be as thorough as possible. Bullet points should not to be used. The paper should be at least 1.5 – 2 pages in length, Times New Roman 12-pt font, double-spaced, 1 inch margins and utilizing at least one outside scholarly or professional source related to project management. The textbook should also be utilized. Do not insert excess line spacing. APA formatting and citation should be used. Computer Support for Project Management

 

Leave a Reply

Your email address will not be published. Required fields are marked *