Hits: 1
Work Breakdown Structure Create a high-level WBS comprised of at least three levels:
• Each level should have with a minimum of five level 1 tasks, with two level 2 tasks, and three (3) Level 3 tasks. • Describe each task (work package) in your WBS with just enough information so that everyone in the team can understand what each work package means. • Level Numbering: o Your first level of tasks should be numbered 1.0, 2.0, 3.0, 4.0, and 5.0. o Your second level of tasks should be numbered 1.1, 1.2, 2.1, 2.2, etc., o The third level of tasks should be numbered 1.1.1, 1.1.2, 1. 1.1.3, 1.2.1, 1.2.2. 1.2.3 etc.
Submit a Word document. • There is no need to use APA formatting for this assignment
Project Unit 4
Regarding the duration of my project, it is directed towards the all over project and the time set to finish the project. Whenever this project laid out and planned, it was set up in a way that every plan made was set up to be complete in a financial and timely way, first step by step by combining the different people that are involved. The individuals that are involved in the plan must come up with different ways of continuing the plan not sure of the completion of the overall plan and when it will be complete.
Create a high-level WBS comprised of at least three levels:
• Each level should have with a minimum of five level 1 tasks, with two level 2 tasks, and three (3) Level 3 tasks. • Describe each task (work package) in your WBS with just enough information so that everyone in the team can understand what each work package means. • Level Numbering: o Your first level of tasks should be numbered 1.0, 2.0, 3.0, 4.0, and 5.0. o Your second level of tasks should be numbered 1.1, 1.2, 2.1, 2.2, etc., o The third level of tasks should be numbered 1.1.1, 1.1.2, 1. 1.1.3, 1.2.1, 1.2.2. 1.2.3 etc.
Submit a Word document. • There is no need to use APA formatting for this assignment Work Breakdown Structure
Project Unit 4
Regarding the duration of my project, it is directed towards the all over project and the time set to finish the project. Whenever this project laid out and planned, it was set up in a way that every plan made was set up to be complete in a financial and timely way, first step by step by combining the different people that are involved. The individuals that are involved in the plan must come up with different ways of continuing the plan not sure of the completion of the overall plan and when it will be complete Work Breakdown Structure