Project Schedule
In this unit, you are required to complete the Project Schedule section of the project plan. Refer to your unit lesson (from this unit and last unit) and required unit resources to advance your project plan. For this assignment, create the components listed below.
4. Project Schedule: Include the duration estimates for all project activities, their activity networks, the project critical path, and estimated project duration.
4.1 Activity Duration Estimates: Include a table with activity number, activity, predecessors, optimistic duration, most likely duration, pessimistic duration, and estimated duration. Be sure to show your paths as well as the critical path. 4.2 Gantt Chart: Show the task, duration, predecessors, and the schedule leveling.
4.3 Activity Network: Be sure to include fully completed nodes, including early start, early finish, late start, late finish, and activity float/slack.
This assignment should be a minimum of two pages in length, not counting the title page and reference page. Be sure to use proper APA formatting. Citations are not required; however, if outside sources are used, make certain to provide in-text citations and references in APA format. For more elaboration on what you should include in your project plan, refer to pp. 539–542 in your textbook.
Project Schedule Assignment Project Help
APA Paper Formatting Basics
- All text should be double-spaced
- Use one-inch margins on all sides
- All paragraphs in the body are indented
- Make sure that the title is centered on the page with your name and school/institution underneath
- Use 12-point font throughout
- All pages should be numbered in the upper right hand corner
- The manual recommends using one space after most punctuation marks
- A shortened version of the title (“running head”) should be placed in the upper left hand corner